Implementing a Major Electrical Upgrade for Existing Stockyard
Intro
The Client engaged MRA to undertake a complete electrical redesign as part of an extension of life project for their existing stockyard machines. This involved the following tasks:
- Liaising with key stakeholders
- Electrical design – HV though to ELV
- Electrical Drafting
- Electrical studies
- Power Studies
- Functional Safety facilitation
- Electrical Procurement SoW packages
Our goal was to provide an electrical design compliant with the latest standards, whilst dealing with the constraints provided by using the existing platform.