Implementing a Major Electrical Upgrade for Existing Stockyard

Intro

The Client engaged MRA to undertake a complete electrical redesign as part of an extension of life project for their existing stockyard machines. This involved the following tasks:

  1. Liaising with key stakeholders
  2. Electrical design – HV though to ELV
  3. Electrical Drafting
  4. Electrical studies
  5. Power Studies
  6. Functional Safety facilitation
  7. Electrical Procurement SoW packages

Our goal was to provide an electrical design compliant with the latest standards, whilst dealing with the constraints provided by using the existing platform.

The results

MRA developed an electrical design for implementation by the client's electrical installation team.